This project assesses different aspects of a building decarbonization plan for Musqueam First Nation public buildings, including capital costs, utility bills, and GHG emissions reduction potential. The budget impact will be determined based on upfront costs including equipment and installation, and the utility costs of using different heating, cooling, and water heating systems in the buildings. The decarbonization plan is focused on replacing the existing systems with heat pumps for space and water heating.

Partner: Musqueam Indian Band
Funder: BC Hydro
Keywords: climate adaptation, green buildings, low carbon buildings 

German Ortega Noriega
2024